ZEEKR 009
ZEEKR 009 import logistics — checking access and unloading space
Agree where the carrier can unload the executive MPV before ordering. Entrance clearance and access roads matter on the final delivery leg.
Reviewed
Gate, ramp and transporter clearance
Measure gate height, usable width and turning space. Check against the chosen 009 and ask the carrier about transporter dimensions and ramp clearance. For an underground garage, check the approach slope separately.
Alternative unloading location
Send site photos and the receiving contact. If a full-size transporter cannot enter, request a different handover point and a separate quote for the short transfer to the showroom.